Robotic UHP hydroblasting · UAE & GCC

We take hulls & tanks back to steel. Robotically.

Our magnetic crawler robots deliver powerful UHP water jetting to remove coatings, corrosion and marine growth — achieving WJ-2 surface preparation with precision and efficiency.

  • No grit, no dust, no spent abrasive
  • 25–50 m²/h per robot
  • Method statement & project file for every job

We operate it. We trust it. We supply it.

Robotic hull hydroblasting · Abu Dhabi, UAE · Oct 2026

2,800bar
UHP jet pressure
9robots
Hydro · sand · paint
25–50m²/h
Per robot, by pump size
24/7
Day + night shifts
SSPC-SP WJ / NACE WJ-2Cleanliness grade, as specified
ISO 8501-4Flash-rust grade after hydroblasting
ISO 8501-1 · Sa 2½Where an anchor profile is required
Project fileMethod, daily log, DFT & joint measurement
Repeat client4 vessels for one Abu Dhabi client in 2026
Vessel stern in dry dock before hydroblasting Illustrative view of the same stern after hydroblasting to WJ-2
BEFOREAFTER · WJ-2
Drag the slider

Same stern, before and after WJ-2

Vessel stern in an Abu Dhabi dry dock. Left: old antifouling as docked. Right: illustrative view of the same stern at WJ-2 — old coating removed, steel ready for inspection.

Plan your job

How long will it take?

Enter your area and see the estimated robot time at WJ-2. We confirm every figure with a method statement and schedule.

—Robot hours
—Days, 2 shifts (20 h)
—Manual-lance days, same area

Get this estimate as an official quotation

Prefer WhatsApp?Send on WhatsApp · Email it

Estimate at WJ-2 on normal coating. Thick antifouling or heavy pitting runs slower. Manual comparison: 2 guns per pump, ≈ 75 m² per gun per 12-h shift.

Follow our work

Live from the dock

Site photos, night shifts and before-and-after shots from our current jobs.